May 31, 2024
CECSA, a subsidiary of the National Electrical Transmission Entity (ENTE), has unveiled the first two hybrid power plants in El Salvador, integrating hydroelectric and photovoltaic generation. Situated in San Matías and San Luis, these plants collectively supply 5.1 MW into the national grid. Source: PV Magazine LATAM