Statkraft has begun construction of its first battery energy storage system (BESS) in Chile, a 20 MW/100 MWh facility at the Cardonal wind farm in Litueche, O’Higgins region. The BESS will connect to the existing 100 MW wind cluster.
Statkraft has begun construction of its first battery energy storage system (BESS) in Chile, a 20 MW/100 MWh facility at the Cardonal wind farm in Litueche, O’Higgins region. The BESS will connect to the existing 100 MW wind cluster.