El Salvador’s CEL has inaugurated the 7.5 MW Berlin binary cycle geothermal power plant in Usulután, which converts waste heat from the existing geothermal facility into electricity. The US$37 million project, supplied by Turboden, increases LAGEO’s installed capacity to 204.4 MW and strengthens geothermal generation, which now provides about 20% of the country’s electricity.


