Ecuador has advanced to the prequalification stage for consultancy services to develop a geothermal power plant at the Chachimbiro site, with applications open until January 4, 2025. The Electric Corporation of Ecuador (CELEC) seeks a consultant to oversee engineering, drilling services, and the commissioning of a 5 MW wellhead plant, paving the way for a 50 MW geothermal facility.