Costa Rica adds 50 MW of solar capacity, with another 36 MW expected by February 2027

Costa Rica’s Electricity Institute (ICE) announced that three solar projects in Guanacaste, totaling 50 MW, have entered commercial operation as part of an 86 MW solar portfolio awarded in 2024. The remaining two projects, totaling 36 MW, are scheduled to begin operations in December 2026 and February 2027. The additional capacity aims to strengthen electricity supply during the dry season, reduce dependence on hydroelectric generation and mitigate the impacts of El Niño.

Source: PV Magazine LATAM