Chilean utility Colbún has begun building a 228 MW/912 MWh battery energy storage system at its Diego de Almagro Sur solar farm in the Atacama region. Spanning five hectares, the project will use lithium-iron-phosphate batteries supplied by Canadian Solar’s e-STORAGE division, with completion and grid connection expected by mid-2026 and full operation by December 2026.