El Salvador has secured a sovereign guarantee for a World Bank loan to finance a 25 MW geothermal power plant in Chinameca, led by state utility CEL. The project, located on the Chinameca Volcano in San Miguel, includes drilling wells, building a steam collection system, and connecting the plant to the national grid.